Case Study

Leicester General Hospital Lighting Upgrades

Leicester General Hospital Works Department employed Acorn MPS electrical division to design and install energy efficient lighting to the workshops and plant rooms across the site.

The design and installation was carried out using energy efficient T5 light fittings as part of the hospitals strategy to replace all existing T8 and T12 fluorescent light fittings achieving lower power consumption across the hospital. In addition to the installation of energy efficient light fittings occupancy sensors have been installed in low occupancy areas to achieve minimum switching, thereby matching intermittent occupancy patterns.